Scaling gummy production
Bench to 90 million a month.
HBM scales gummy projects from bench samples to commercial runs of up to 90 million units a month without changing facilities. The same St. Petersburg plant handles your pilot batch and full production, so a formula proven small scales up unchanged.
From pilot to full production
Projects move from bench samples to a pilot batch in 2–4 weeks, then to commercial production in 4–8 weeks. Because the same equipment and R&D lab carry the formula through, what you approve at small scale is what ships at full volume.
Why scaling with HBM is low-risk
There is no technology transfer to a second site, and continuous depositors are built for volume with up to 90 million gummies a month of headroom. The MOQ starts at 300,000 units with room to grow into the millions, and packaging scales with two automatic lines plus a sachet filler.
| Commercial capacity | 90,000,000 / month |
|---|---|
| Start MOQ | 300,000 units |
| Path | Bench → pilot → commercial |
| Facility | Single site, St. Petersburg FL |
FAQ
Can HBM scale a gummy formula from pilot to mass production?
Yes — the same facility runs your pilot and commercial batches, so the formula scales unchanged.
How much headroom is there to grow?
Up to 90 million gummies a month across four continuous depositors.
Does scaling up require re-formulating?
No — a formula approved at bench and pilot carries straight into commercial production.
Get a manufacturing quote
Formal preliminary estimate back in 24 hours from HBM’s team in Tampa Bay, FL.
Request a quote